Munich Airport's new Terminal 1 pier, developed by Flughafen München GmbH, adds capacity for six wide-body aircraft as part of a joint growth strategy with the Lufthansa Group running through 2056.
Quantity-survey-based cost calculation from the earliest planning stage.
Contracts and commitments tracked from pre-construction, not from the first invoice.
Forecast vs. actual, reconciled continuously, line item by line item.
Decide · AI Report Builder — build any report from a prompt. A controller writes a prompt once for a monthly variance report across three projects; from then on it updates itself automatically as new cost data arrives.
Illustrative only — figures below are fictional and do not represent the program's actual line-item data.
One package is drifting 10% over — flagged automatically, three quarters before the original plan would have caught it.
Additional perspective from Harald Rohr is a named source for this engagement — quote pending confirmation, left blank rather than paraphrased.
A short conversation is enough to show what PROBIS looks like in your context.