§ 01 — Industry: Data Centers

~2% of the budget. On schedule. From pre-construction onward.

A Google data center in Hanau, developed by the NDC-GARBE joint venture, closed within approximately 2% of its approved capex with PROBIS in from pre-construction, running QS, pro forma, and cost control from the start.

~2%
Variance from approved budget at close, delivered on schedule
End user: Google · Developer: NDC-GARBE joint venture
Photo
Data Centers
§ 02 — The Outcomes, In Approximate Figures

All figures below are approximate, as supplied.

4
Floors
~10,000m²
Facility size
~15 MW
IT load capacity
~€150M
Capex
app.prob.is/airports/frankfurt

Data Center, Hanau · NDC-GARBE for Google

Hanau Data Center

On schedule
~20-25 km
To DE-CIX Frankfurt
~2%
Within approved budget at close
Pre-construction
PROBIS engaged from

QS, proforma, and cost control ran on PROBIS from before the first shovel of dirt.

§ 03 — Real Data Center Engagements on PROBIS

Technologiepark Wolfgang, Hanau, Germany
NDC-GARBE Google-Rechenzentrum, Hanau
NDC-GARBE

Learn more →
§ 04 — Why This Is Hard To Pull Off

Data centers compress a normal build timeline into a race.

01

Pre-construction is where the budget gets set

By the time steel is on site, most of the capex decisions that matter are already locked in — a pro forma built on assumptions, not a live cost structure, is the wrong tool for that stage.

02

MW and m² both have to work

IT load capacity and floor area are negotiated together with the end user — a cost overrun in one changes the economics of the other.

03

Network proximity is a cost variable, not just a location decision

Distance to a hub like DE-CIX Frankfurt affects connectivity cost assumptions baked into the original business case.

04

The end user isn't the developer

Google and NDC-GARBE need the same numbers, from two different vantage points, without reconciling two separate cost models.

airports · before PROBIS
Before 2017
Excel — Cost tracking, project by project
FRA-IMP — Legacy internal system
SAP modules — Partial financial coverage
Manual roll-up — ~1 week per portfolio report

Three separate systems, reconciled by hand now one platform, one click.

§ 05 — How It's Built: The Modules

Four modules, engaged from pre-construction.

app.prob.is/contract

Contract

Every package, from pre-construction

Contracts and commitments tracked from before construction starts, not after the first invoice arrives.

Automated contract reading & archiving
Digitized change-order management
End-to-end invoice automation
app.prob.is/control

Control

Cost control against a ~€150M capex

Forecast vs. actual, held to the line item, closing within roughly 2% of the approved budget.

Planned vs. actual, live
Variance reports on demand
Continuous KPI reconciliation
app.prob.is/rent-sell

Rent & Sell

Leasing & sales revenue tracking

Revenue control across leasing, sales, and additional claims, reconciled against the cost side.

Lease & sale tracking
Additional claims management
Revenue vs. cost reconciliation
app.prob.is/manage

Manage

Reporting & workflow automation

Board-ready reporting and workflow automation, generated on demand rather than assembled by hand.

One-click board reports
Automated workflow routing
Audit-ready documentation
§ 06 — How It's Built: The AI

Keeping a ~2%-variance outcome repeatable.

app.prob.is/ai/early-warning

Early Warning System

Risk identification

Flags a cost or schedule deviation against threshold the month it appears, not the quarter a report surfaces it.

Continuous variance monitoring
Threshold-based alerts
Risk register, updated automatically
app.prob.is/ai/benchmarking

AI-Powered Benchmarking

Benchmarking

Benchmarks a data-center build against comparable projects, not just this one.

Internal + external benchmark data
Sector-level comparison
Continuously updated as new projects close
app.prob.is/ai/calculate-control

Bidirectional Calculate & Control

Live re-forecasting

When a capex input shifts, downstream KPIs recalculate automatically instead of waiting for the next manual update.

Automatic KPI recalculation
Two-way sync between feasibility and control
No manual re-modeling per change
§ 07 — How It's Built: The Dashboard

Pre-construction to close, on one view.

Illustrative only — figures below are fictional and do not represent this project's actual budget data.

app.prob.is/data-centers/cost-control
By Package
By Quarter
Fictional Data — Illustrative Only
Data Center Build — Cost Control
On budget
Package
Budget
Forecast
Status
Shell & Core
€58M
€57.2M
On budget
Power & Cooling
€44M
€45.9M
Review
Network Fit-Out
€22M
€21.8M
On budget
Site & Landscaping
€9M
€8.9M
On budget

One package is drifting 10% over — flagged automatically, three quarters before the original plan would have caught it.

§ 08 — Proof From The Field
A client quote from Peter Pohlschroeder has been requested for this case and is not yet confirmed. That slot is left empty here rather than filled with a paraphrase.
Named: Google (end user), NDC-GARBE (developer)
Quote requested — not yet confirmed

QS, proforma, and cost control ran on PROBIS from before the first shovel of dirt.

Running an airport program on spreadsheets?

A short conversation is enough to show what PROBIS looks like in your context.

§ — All Programs On PROBIS

Every program in this industry, live.

No items found.