BMW Group Plant Munich transformation
Munich, Germany
Project

Four new buildings, built while the line keeps running.

BMW Group Plant Munich is being transformed with four new buildings, including a body shop and vehicle assembly, on about a third of the site, while around 1,000 vehicles a day keep leaving the line.

BMW Group Plant Munich · Control view

PROBIS Control · indicative figures
  • €650MInvestment
  • 4New buildings
PackageBudgetVarianceStatus
Body Shop€240M−1.8%On budget
Vehicle Assembly€210M+4.2%Review
Logistics Hall€120M0.0%On budget
Energy & Utilities€80M0.0%On budget

Illustrative only. Figures are fictional and do not represent actual project data.

BMW
Client
Control
Calculate
Contract
Manage
The project

The project, in numbers.

BMW Group Plant Munich: four new buildings, including a body shop and vehicle assembly, built against live production.

PROBIS runs project controlling on the plant construction against live operations, covering budget, forecast and commitment tracking in one governed structure. Around 1,000 vehicles a day keep leaving the line while the new buildings go up.

Location
Munich, Germany
Timeframe
–
2027
Asset class
Scope
Client
BMW
  • €650M Investment
  • 4 New buildings, including body shop and vehicle assembly
  • ~1/3 Of the plant site
  • ~1,000 Vehicles a day still leaving the line
On the platform

The modules behind this project.

The PROBIS modules used on this project, shown on illustrative screens with demo data.

Control
Forecast vs. actual reconciled continuously, line item by line item.
Calculate
Quantity-survey-based cost calculation from the earliest planning stage.
Contract
Contracts and commitments tracked from pre-construction, not from the first invoice.
Manage
Ongoing asset and facility management once the project is in operation.
app.prob.is/projects/
bmw-group-plant-munich-transformation

BMW Group Plant Munich · Control view

PROBIS Control · indicative figures
  • €650MInvestment
  • 4New buildings
PackageBudgetVarianceStatus
Body Shop€240M−1.8%On budget
Vehicle Assembly€210M+4.2%Review
Logistics Hall€120M0.0%On budget
Energy & Utilities€80M0.0%On budget

Illustrative only. Figures are fictional and do not represent actual project data.

app.prob.is/projects/northwind-yards

Northwind Yards · Forecast to complete

PROBIS Control · demo data
  • $104.5MBudget
  • $101.3MCommitted
  • $66.9MInvoiced
  • +1.2%Forecast variance
PackageBudgetForecastStatus
Shell & core$38.2M$38.0MOn budget
Facade$14.6M$15.3MReview
MEP$27.9M$28.4MReview
Fit-out$16.4M$16.4MOn budget

Forecast at completion $105.8M. Illustrative screen with fictional demo data.

Control
Calculate
Contract
The client
BMW

BMW Group is the Munich-headquartered premium automotive manufacturer behind the BMW, MINI, Rolls-Royce, and BMW Motorrad brands, running a global production network.

View client
More in this industry

Other programs on PROBIS.

St. Raphael Schule, Frankfurt am Main
Frankfurt am Main, Germany
St. Raphael Schule, Frankfurt am Main
St. Raphael Schule: a new Catholic gymnasium in Frankfurt for 810 students, with a chapel, cafeteria, and sports hall serving as an open community space.
LogPlaza Gladbeck
Gladbeck, Germany
LogPlaza Gladbeck
LogPlaza Gladbeck: a 26,000m² logistics center with three halls, 23 loading docks, and EV/e-bike charging infrastructure.
LEONET, Bayern
Bayern, Germany
LEONET, Bayern
LEONET: fiber-optic network expansion across multiple underserved Bavarian towns, connecting over 25,000 customers.

Expanding a plant while production keeps running?

Want the same control on your next project?